On-site installation must strictly adhere to railway construction safety regulations. Formal procedures for track closure (blocking the line to traffic) must be completed in advance; performing work on the track while trains are permitted to pass is strictly prohibited.
Pre-installation Preparations
Verify that the turnout condition meets civil engineering standards: the ballast bed must be level, the spacing between sleepers at the traction points must be correct, the gauge must be accurate, and the static, macro-level contact (fit) between the switch rail and the stock rail must comply with technical requirements.
Perform a trial assembly of the external locking device on the ground before installing it on the turnout. Ensure all components fit together without binding or obstruction. The device must be in an "unlocked" state during installation on the track to prevent damage caused by mechanical stress.
Use a 500V megohmmeter (insulation tester) to measure the insulation resistance of the locking rod's insulating components; the resistance must be at least 100 MΩ to satisfy electrical isolation requirements.
Mark the drilling locations on the rails according to the blueprints. Use a φ21 drill bit to bore holes through the rail web, and verify that the hole position deviation does not exceed ±3 mm.
Installation of Main Components
Connect the two sections of the locking rod, ensuring the connection is straight. Secure the assembly with insulating backing plates and fishplates (clamping plates), but do not install the limit rings at this stage.
Pre-install the locking frames onto the stock rails on both sides using M20 bolts. Do not fully tighten the nuts yet, leaving room for subsequent adjustments.
Pre-install the switch rail connection brackets onto the switch rails at the designated positions; again, do not fully tighten the fasteners.
Insert the locking rod's protruding lug into the notch of the locking hook, and slide the entire assembly through the locking frames on both sides. Apply a uniform layer of grease inside the locking hook's pin holes.
Connect the locking hook to the switch rail connection bracket using a pivot pin. Tighten the nut, then insert a cotter pin and spread its ends completely to lock it in place.
Insert the locking block into the square opening of the locking frame. Secure it by hooking the fixing bolt onto the stock rail, then add a flat washer, a spring washer, and a nut-do not fully tighten yet.
Shift the switch rails so that one side is in full contact (closed) and the other is separated (open). Lift the locking hook and maneuver the locking rod into its proper position. Repeat this process to install the locking hook on the opposite side. Adjust the coaxiality of the locking frames on both sides to ensure that the locking rods remain perfectly parallel to the switch machine's operating rod; once it is confirmed that there is no binding or jamming throughout the entire throw, tighten the locking frame securing nuts.